The whole population.
Every entry of the period, not a sample.
The test.
The same rule runs on every line, and every result keeps its source.
The exceptions.
Lines that fail are set apart, with the reason they were flagged.
The signed conclusion.
The auditor reviews the exceptions and signs the conclusion. The opinion stays human.
Supporting practice
Audit engagements leadership can follow.
Internal audit is not IMNOS Technologies’s central practice. It is a supporting one: a map of risks for a defined scope, internal control, compliance, recommendations that can be acted on, and reporting.
What the engagement brings.
01
An outside view
The work is done outside the reporting line of the area under review. Findings rest on documents and interviews.
02
A map that can be argued with
Risks, processes, and existing controls are set out so a committee can discuss them, drop them, or rank them.
03
Recommendations that can be held
Each recommendation names an action, an owner, and a horizon. A recommendation with no possible follow-up is not a recommendation.
04
Reporting a committee can use
The write-up is for leadership and the audit committee: findings, limits of the work, and an order of priority.
One control, from start to finish
From the whole population to a signed conclusion.
How an engagement runs.
The calendar follows the scope. The order of the work does not.
01
Framing
Scope, risks already sensed, access to documents, calendar, and counterparts. The engagement letter states what will be covered, and what will not.
02
Mapping
Processes, controls in place, areas poorly covered. The map is the basis of the work.
03
Fieldwork
Interviews, document review, tests on evidence. Weak points are supported. Solid points are said as well.
04
Reporting
Findings, recommendations, order of priority. A session with the sponsors, then the material for the committee.
05
Follow-up
A point on the recommendations, if follow-up was agreed. In that case the engagement does not end when the report is sent.
Who it is for.
Finance leaders, audit, internal control or compliance teams, and executives of mid-sized companies. The engagement is bounded. It does not promise a certification, or a system independent of the context.
AI can support the tracking of recommendations and the reporting. The engagement remains a practitioner’s work: the tool does not sign the report.
Usual deliverables.
- Scoping note
- Map of risks and controls
- Engagement report
- Recommendation plan
- Committee material
Talk about a scope.
Name the entity, the function concerned, and what you expect from the committee. We come back to frame the work, or to say if the engagement is the wrong answer.